Skip to content

Digital safety case platform

Building safety.A clearer picture.

Bring assessments, evidence and actions into one connected workspace. Understand what is known, what needs attention and what supports each decision.

  • Guidance-mappedStructure follows the GOV.UK safety case report guidance.
  • Versioned evidenceEvery link points at a specific document version.
  • Recorded decisionsNamed reviewers, dated approvals, immutable reports.
Building safety. A clearer picture.
Illustrative demo · Meridian Point, 17 storeys, 128 flats (fictional)
Plant and risersFire doorsCompartmentationDetection systemsStructural information
  • AssessmentBSA-HRB-ENG v1
  • EvidenceCompartmentation survey v2
  • Open actionA-001 · due 7 Nov
  • ReviewChanges requested · SC-5
  • Safety case reportRevision 1 · issued
FS-COMP-1Has a compartmentation survey been carried out, and what did it find?EvidenceCompartmentation survey report v2Accepted for this purposeAction A-001 · due 7 Nov 2026Review Changes requestedIllustrative, fictional
  1. Buildings01
  2. Assessments02
  3. Evidence03
  4. Actions04
  5. Reviews05
  6. Safety cases06

Buildings. A register of every building with its facts, dutyholders and an explicit applicability decision.

A folder of documentsis only the beginning.

A folder of documents is only the beginning.

The value comes from understanding how the information fits together: which risk it relates to, what it supports, what remains unresolved and who needs to act.

Uploading a file records it. It does not, by itself, demonstrate anything about the building. Linking it to a question, reviewing it and acting on what it says is where the work happens.

  • Fire risk assessment
    Source
    Solent Fire Consultancy
    Version
    v1
    Owner
    H. Reilly
    Review
    Sep 2027
    Next action
    A-003 door access
  • Compartmentation survey
    Source
    Solent Fire Consultancy
    Version
    v2
    Owner
    T. Okafor
    Review
    Aug 2029
    Next action
    A-001 fire stopping
  • Electrical condition report
    Source
    Brightwire Electrical
    Version
    v1
    Owner
    T. Okafor
    Review
    Dec 2030
    Next action
    None
  • Fire door inspection record
    Source
    Site team
    Version
    v1
    Owner
    T. Okafor
    Review
    Jan 2027
    Next action
    Review by M. Lindqvist
  • Structural condition survey
    Source
    Hartwell Structures
    Version
    v1
    Owner
    T. Okafor
    Review
    Sep 2030
    Next action
    A-002 riser survey
  • Each record points to a building, a question, an owner and the next step. Illustrative demo.

See how the pieces connect.

See how the pieces connect
Building portfolios · Meridian Point (illustrative demo)
BuildingReferenceApplicabilityOpen actionsSafety case
Meridian PointHL-001Template applies3In internal review
Cotswold CourtHL-002Template applies4Not started
Alder WharfHL-003Template applies2Changes requested

Same information.Stronger connections.

Same information. Stronger connections.

Drag the divider or use the toggle. The five facts are identical in both views; only their relationships change.

Scattered information

Shared drive / Meridian

  • FRA_final_v3 (2).pdf
  • FRA_final_v3.pdf
  • comp survey AUG.pdf
  • comp survey AUG (reissue).pdf
  • comp survey AUG (1).pdf

actions_tracker_2026.xlsx

fire stopping risersDev?Nov
door access letters?

Email: RE: RE: survey findings

"…couldn't get into the cupboards on 10 and 11, will try again…" · "Marcus wants the residual rating explained before he signs off"

Which survey file is current? Who owns the fire stopping action? Where is the reviewer's request recorded?

Connected workspace · Meridian Point

Evidence

  • Compartmentation survey v2 · currentAwaiting review
  • Compartmentation survey v1Superseded
  • Fire risk assessment v1Accepted

Action A-001

Complete fire stopping to six riser penetrations

Owner D. Patel · due 7 Nov 2026 · verification required

In progress

FS-COMP-1 response

Partially · survey v2 linked

Uncertainty: floors 10 and 11 not accessed → A-002

Review history

15 Oct 2026 · M. Lindqvist · changes requested

"State the likelihood and consequence used and cite the matrix criteria."

Same facts, now attached to the building, a version, an owner and a decision. The organisation of information does not change the building's condition.

Scattered informationConnected workspace

Know what supportsthe decision.

Know what supports the decision.

IDENTIFY

Record the risk or question.

  1. IDENTIFY (current)
  2. CONNECT
  3. REVIEW
  4. ACT
  1. 1 · IDENTIFY

    R-001 · fire spread

    Fire spread between floors through unsealed service penetrations in riser cupboards

    Location: riser cupboards, floors 3 to 11 · Rating: High confirmed by H. Reilly

  2. 2 · CONNECT

    Linked to R-001

    • Evidence: compartmentation survey v2 Awaiting review
    • Control: riser cupboards locked and inspected quarterly In place
    • Control: fire stopping programme Partial
    • Safety case section SC-5
  3. 3 · REVIEW

    Gap view

    • 1 claim without accepted evidence (SC-5)
    • 2 documents awaiting review
    • 1 uncertainty: floors 10 and 11 unsurveyed

    A documentation check, not a legal verdict.

  4. 4 · ACT

    A-001

    Complete fire stopping to remaining six riser penetrations

    Owner D. Patel · due 7 Nov · priority High: breaches undermine the stay put strategy

    OpenIn progressReady for verificationClosed

Evidencewith context.

Evidence with context.

A passage in a document supports one specific record. RiskAtlas keeps that relationship visible: which version, which page, which question, who reviewed it and when.

Compartmentation survey reportv2 · currentpage 4 of 18

4. Findings · Riser cupboards (fictional demo document)

4.1 Riser cupboards on floors 3 to 9 were inspected visually with limited intrusive opening of ceiling voids.

4.2 Twenty-three service penetrations were found without fire-resisting sealing. Seventeen had been repaired at the date of this reissue, with photographic records provided by the contractor.

4.3 Riser cupboards on floors 10 and 11 could not be accessed and are excluded from these findings.

4.4 It is recommended that the remaining six penetrations are sealed with a tested system within eight weeks…

Linked assessment response

FS-COMP-1

Has a compartmentation survey been carried out, and what did it find?

Answer: Partially · Evidence: v2, page 4 (4.2)

Reviewer comment · M. Lindqvist · 15 Oct 2026

"Accepted for this question. Please link the photographic record separately so the seventeen repairs are evidenced, not only described."

Accepted for this purpose
Review date: Aug 2029 (survey recommends re-inspection in three years). A review date is a prompt to look again, not a legal expiry.
  1. Uploaded

    The file is stored privately with its metadata. Nothing is proved yet.

  2. Linked

    A specific version is attached to the record it is meant to support.

  3. Reviewed

    A reviewer has looked at the document and recorded a decision and rationale.

  4. Accepted for this purpose

    The reviewer accepted it for this record. Not a statement about the whole building.

  5. Superseded

    A newer version exists. Links to the old version are flagged, not switched silently.

Make the nextstep visible.

Make the next step visible.

Open → In progress → Ready for verification → Closed. An action that needs verification is only closed after a second person records a decision.

or choose a step

A-001 · Meridian Point (illustrative demo)

Complete fire stopping to remaining six riser penetrations

Open

Raised by H. Reilly (assessor)

Priority High: breaches undermine the stay put strategy. Owner D. Patel. Due 7 Nov 2026. Verification required: post-works inspection with photographs.

Owner
D. Patel
Due
7 Nov 2026
Verification
Required

A short walk throughthe workspace.

A short walk through the workspace

Five steps using the fictional demonstration organisation. Move at your own pace; nothing waits for an animation.

HL-00117 storeysTemplate applies
Buildings

Buildings

Export CSVAdd building
Search name, address, referenceAll jurisdictionsAny applicability
BuildingRefLatest assessmentSafety caseOpen
Meridian Point
17 storeys · 128 units
HL-0017 Oct 2026
Submitted for review
In internal review3
Cotswold Court
8 storeys · 46 units
HL-00214 Oct 2026
Draft
Not started4
Alder Wharf
12 storeys · 84 units
HL-00328 Aug 2026
Reviewed
Changes requested2
Illustrative demo · fictional building and people
The register shows reference, jurisdiction, lead, latest assessment, safety case state and open actions for every building. Open Meridian Point. Previews are built from the application's own components with fictional data; the authenticated workspace requires an account.

Questions,answered plainly.

Frequently asked questions

Answers describe what the product does today, not what is planned.

Bring the evidence together.Make the next step clear.

Bring the evidence together. Make the next step clear.

Demo requests go through the contact form and are stored for the RiskAtlas team to respond. No email address is published that we cannot verify.

  • Building
  • Assessment
  • Risk
  • Control
  • Evidence v2
  • Action A-001
  • Review
  • Report · Rev 1